Quote:
Originally Posted by DWM222
Tigger-FYI...6 or 8 years ago, my partner & I were building a house for a client..partner got in a hurry & had the insulation blown in on the outside walls before the siding was on (just had osb)..got wet..had to replace it all..cost us thousands (& I'm still pissed..  )
(tyvec wasn't on yet either)
|
Yea i have heard that but i plan on having the siding on before i do any of the insulation inside. Need to let it dry out really good first. I'm doing most of the building my self so its slow and the winter got me before i could get it covered.